Top Banner Border.
FBE Associates Logo and Banner.

 

 Company Information

News
History
General
Contact FBE
Email Sales
Email Support
Phone, Fax & Postal
 
 
 

 

Home

Outline for Initial Training Sessions

Session #1 Goals for initial training.

A. Become familiar with the use of screens for an existing job:

Job Screen, Job Data Screen,
Flow Tree
Site Plan
Fab. Steel & Cast Iron Screen
            Grate, Cover and Height
Pipe Screen
             Range of possibilities

B. Become familiar with the use of screens for a new job:

All above plus…..

Structure Screen
            English Reference Jobs
                        Storm only: 24”d, 36”d, 3’x 3’, 4’x 4’,5’x 5’, 6’x 6’
                        Sanitary & Storm mixed: 48”, 60”, 72”

             Metric Reference Jobs
                        Storm only: 1200mm, 1500mm, 1800mm, 2400mm, 3000mm
                                              600mm x 1200mm DIs, 600mm x 600mm DIs     
                                              600mm x 600mm CBs, M-Boxes
                        Sanitary only: Sanitary

Automatic Stacking Screen
            Review Build Height Calculations
            Goodness Criteria
            Description-Only bases may have two lines

Plan View
Elevation View
Rollout View
Butterfly View

Reports Screen
            Choices of Structures
            Choices of Reports
                        BOM, BOM Summary, Custom Piece, Structure Drawing

C. Create, stack and print structure reports
            Red River Example:                         Do five or six structures
            Real Life Example #1:            Structure #1, Structure #2

Session #1 Review

Part #1 –Main Screen
File

Screens
Screen names

Help
Screen Icons

Part #2 – Job Setup

Job Screen, Job Data Screen

Part # 3 – Input with Red River Example

Flow Tree/Site Plan, Fabricated Steel, Pipe, Structure, Notes

Part #4 - Viewing

Status Screen
Site Plan, Plan View, Elevation View, Rollout View, Butterfly View

Part #5 – Automatic Stacking

Automatic Stacking Screen

Part #6 – Reports

Report Screen

Part #7 –Almost Nothing about Reference Jobs

Structure Design Screen


 

Part #8 – How to select/create a job

Job Screen, Job Data Screen

Part #9 – How to enter Structure Data

Flow Tree/Site Plan, Fabricated Steel, Pipe, Structure, Notes

Part #10How to stack a structure

Automatic Stacking screen

Part #11 – How to view Plan and Elevation views on-line

Plan View and Elevation View Screens
Rollout and Butterfly Views

Part #12 – How to create reports

Report Screen

Session #1 Homework

Several hours of practice should be spent on the above topics, doing the practice
example on Page 5 and then on representative simple structures of the type that your company will manufacture.  Keep a list of questions.  Do not use the Structure Design Screen.  The relationship of Reference Structures, Build Heights and Reference Jobs
will be handled in Session #2.


 

 

Session #2 Goals for initial training session #2.

Part #1 Understanding Structure Design, Build Height and Reference Jobs

Part #2 Using the Stack Editor

Session #3 Goals for initial training session #3.

Optional Review of Selected Topics

Part #1 Unlinked Data

Part #2 Archiving Data

 

Red River Example  Training Problem – English Measurements (in feet and inches)

Struc
ture

Type

T.O.C.

Sump

Steel

Outlet Invert

Inlet Invert

From

Angle

Dist
ance

Pipe

Pipe
Material

MH1

60” Storm

903.2’

0”

1772

894.2’

 

 

10.5’

18”

RCP C-Wall

 

894.2’

MH2

65°

33.5’

18”

RCP C-Wall

MH2

48” Storm

908.5’

0”

1772

895’

 

MH1

33.5’

18”

RCP C-Wall

 

895.0’

MH3

188°

31.6’

12”

RCP C-Wall

MH3

48” Storm

907.1’

0”

1772

896.6’

 

MH2

31.6’

12”

RCP C-Wall

 

899.0’

MH4

181°

57’

12”

RCP C-Wall

 

896.6’

MH5

242°

46.1’

12”

RCP C-Wall

MH4

48” Storm

913.1’

0”

1772

901.7’

 

MH3

57’

12”

RCP C-Wall

MH5

48” Storm

912.5’

0”

1772

898.5’

 

MH3

46.1’

12”

RCP C-Wall

 

905.1’

MH6

121°

37’

12”

RCP C-Wall

MH6

48” Storm

915.6’

24”

1772

908.1’

 

MH5

37’

12”

PVC Sdr 35

 

908.1’

CB1

180°

15’

8”

PVC Sdr 35

 

908.1’

CB2

90°

15’

8”

PVC Sdr 35

 

Red River Example  Training Problem – Metric Measurements (in meters)

Struc
ture

Type

T.O.C.

Sump

Steel

Outlet Invert

Inlet Invert

From

Angle

Dist
ance

Pipe

Pipe
Material

MH1

1800 Storm

275.2

0

1772

272.5

 

 

3.2

.45

RCP C-Wall

 

272.5

MH2

65°

10.2

.45

RCP C-Wall

MH2

1200 Storm

276.9

0

1772

272.7

 

MH1

10.2

.45

RCP C-Wall

 

272.7

MH3

188°

9.6

.30

RCP C-Wall

MH3

1200 Storm

276.4

0

1772

273.2

 

MH2

9.6

.30

RCP C-Wall

 

274

MH4

181°

17.3

.30

RCP C-Wall

 

273.2

MH5

242°

14

.30

RCP C-Wall

MH4

1200 Storm

278.3

0

1772

274.8

 

MH3

17.3

.30

RCP C-Wall

MH5

1200 Storm

278.1

0

1772

273.8

 

MH3

14

.30

RCP C-Wall

 

275.8

MH6

121°

11.2

.30

RCP C-Wall

MH6

1200 Storm

279

.60

1772

276.7

 

MH5

11.2

.30

PVC Sdr 35

 

276.7

CB1

180°

4.5

.30

PVC Sdr 35

 

276.7

CB2

90°

4.5

.30

PVC Sdr 35

 

 

 

MCPX 2009

Manufactured Concrete Products Expo logo.

Please stop by our booth at the MCPX 2009 show in Houston, Texas to see MH Pro!.

National Precast Concrete Association Logo.

National Precast Concrete Association  

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

about us | history | news | contact fbe | home          ©2007 FBE Associates, Inc. All Rights Reserverd. MH Pro! is a trademark of FBE Associates, Inc.